Skip to Content

Barangaroo International Tower Complex

Contracted as a primary test technician to conduct pre-commissioning testing on the 33/11kV primary system. Multiple Substations consisted of 33kV/ 415V & 33/11kVTransformers, Indoor: 33kV GIS, 11kV GIS & 415V 3000Amp panels

Gladstone Liquified Natural Gas Project

Contracted as a primary test technician to conduct pre-commissioning testing on the 6.6kV/400V primary system. Multiple Substations consisted of Wilson 6.6kV/ 400V Transformers, Indoor: 6.6kV Siemens Air insulated Switchgear, 400V Siemens 3000Amp panels

Southern Seawater Desalination

Project: Southern Seawater Desalination Project Stage 1
Activity: Install and pre-commission 55 x panels…

Tallawarra Terminal Station

Project: Tallawarra Terminal Station
Activity: Install and pre-commission 25 x 132kV AEM…

Neerabup Power Station

Project: Neerabup Power Station
Activity: Install and pre-commission of 2 x 330kV Siemens Live Tank Circuit…

Mt Te uku wind farm

Project: Mt Te uku wind farm.
Activity: Install and pre-comission Siemens 33kV GIS switchgear